CENTRAL MARINE CONSTRUCTION

Phone: (920) 294-1042            E-Mail

Back

   

 

Permanent Pier Over Wetland

This satisfied customer had a special problem. In order to reach open water, he had to cross over 100' of wetlands or water depending on water levels. Our solution was to install 120' of permanent pier over the wetlands, then 60' of removable dock with a Shorestation boatlift.


And Stairs, Too!

Additionally, we installed 3 sections of matching stairs up the hill to provide easy and safe access both up and down the hill.

The end result is our customer can enjoy his waterfront property instead of viewing it! If you have a similar situation...contact us.


Removable Pier

This installation coordinates with the existing boathouse and steps. Additionally, the project called for a swim pier with a boat slip and another boat pier.


With Swim Pier

The swim pier consist of a wide double-L section which provides users a large area to sun bathe, dive into water, easy docking for multiple boats...or relaxing spot to listen to the lapping of the waves and watch the sunset.


Big Cedar,Washington Countie

This project we set the toe rock or the base rock first. Then we removed the railroad ties to stop soil from entering the lake.


This shoreline is now more user freindly,walk up or down the rocks they won't move. Sloped properly and also has a flat face so ice can ride up and also break the waves.




Sunstream Boatlift

This custom canopy has a Sunstream Boatlift which gives a clean or non - cluttered appearance


Removable Pier & Canopy

This customer was the first 6x6 pier built on Big Green Lake in 1997. He was looking for something unique to match his unique home.



Custom Steel Gates

This pier features a steel gate, hand made for a waterfront development.It was sand blasted and powder coated black with colored leaves.




HOME

 

Copyright 2004 - Part of the Valuworld.com Network of Websites